Czech Republic

Tieto Tower

<p>The office building in the Náměstí Republiky square. An extensive delivery of air-handling equipment.</p>
Administration
Česká republika
2012

The office building in the Náměstí Republiky square. An extensive delivery of air-handling equipment.

Tesla Jihlava

Tesla Jihlava
Industry
Česká republika
2011

Remak delivers a range of air-handling units for a new TESLA production plant being built in Jihlava.

Matějček High School

Matějček High School
Education
Česká republika
2013

Swimming pool renovation - a delivery of the AeroMaster Cirrus swimming pool units, including control.

Radotín Sportshall

Radotín Sportshall
Sport
Česká republika
2009

A delivery of the roof fans and two AeroMaster XP 10 and AeroMaster XP 06 air-handling units for ventilation of

Schott

Schott
Industry
Česká republika

The Vento duct system and AeroMaster XP unis controlled using the VCB control unit.

Ambra residence

Ambra residence
Hotels and restaurants
Česká republika
2009

A delivery of the AeroMaster XP 10 and AeroMaster XP 4 units and Vento system.

UP naturalistic faculty

UP naturalistic faculty
Education
Česká republika

A delivery of the AeroMaster XP and Vento units and DoorMaster door air curtains.

Preciz

Preciz
Industry
Česká republika

A delivery of eight AeroMaster XP 22 air-handling units equipped with a gas heater.

FORUM Nová Karolina

FORUM Nová Karolina
Administration
Česká republika
2012

Shopping and entertainment centre. An extensive delivery of air-handling systems.

Vítkovice city stadium

Vítkovice city stadium
Sport
Česká republika
2013

A delivery of the AeroMaster XP and Vento air-handling units, including the VCS control unit.

Pages

Subscribe to RSS - Czech Republic